Friday 22 September 2017

Lots To Do Now !

07.30 Saturday 23rd of September 2017

A dry but overcast day forecast today - Lots to do !!

Materials prepared -

Wood to finish the internal window.
Stop laths and hardware for the doors.
Insulation and OSB to finish the sheathing above the doors/window.
Timber to make the massive fascia board for the front - ( 11inches x 1.5 inches x 15 feet )
90 feet of Shiplap cladding for the front - YIPPEE !!
Primer paint for the front woodwork.
Paint for the cladding - (2 gallons !!!)
All the slate lath to fit onto the Tyvek paper as bearers for the side cladding.
20 LED downlights for internal lighting.

That lot should keep me busy for a few weeks - BETTER GET CRACKING !!

I made a start last night and fitted the decorative moulding to the centre doors - looks great - photo's later.

Mike.