Thursday 8 December 2016

No Progress

Wednesday 7th of December 2016

No progress on site since the last post but busy - busy - just the same.

Tuesday

Jackie has a bad cold and needed TLC - no problem.

The compactor was collected promptly - no problem.

A tip run to dump the double glazed units - done - very helpful tip guys !

A new front tyre for my poor little car - wearing very uneven - must get it checked.

Loaded the trailer with logs to be cut on the big band saw in Sheffield.

Loaded all scrap steel for a scrap yard run - including unwanted engine block and parts.

Wednesday

On a MISSION !!!

Up at 4.30 - on the road 5.15 !

At the unit in Sheffield before 6.30.

Unloaded logs.

Loaded scrap steel from container to trailer now full !

Emptied the first wood rack in the container - sorted the wood.

Re-organised the back of the container and stacked things tighter + neater.

Dismantled the rack an stashed the parts.

Re-stacked the wood on the second rack to the roof !

Stacked the 2 inch Elm boards for easy access.

A quarter of the container now empty - fantastic.

Ran to the scrap yard and unloaded - £26 - not bad.

Cut the logs to firewood size chunks - trailer now full.

Loaded 7 bags of dry firewood from my unit 5 stock into my poor little car.

Moved lots of my stored stuff from unit 5 into the container with help from the lads - great help !

Ran to MAES in Rotherham - dropped off the starter motors an alternator from the scrap engine for testing / quote for servicing - great.

Drove home to derby - big day !!

I feel better now that most of my stuff is out of unit 5 - just small stuff left - must get some tote bins from Scott's storage loft.

Rain all day Thursday - good to have multiple jobs completed in the dry - perfect.

Mike.

No comments:

Post a Comment