Friday 18th of November 2016
A lovely dry - sunny day today - time to sort things out.
As I said before, the site is wet and sludgy and our dog Penny loves to sniff out trails and she couldn't care less about getting muddy and then going straight indoors onto the white settee !!!
The Plan - To erect a simple light weight fence, the full length of the site with a wide, hook on, gate for wheel barrow access.
So I dug out some long lengths of reclaimed timber - plus some new - for the hand rail @ about 45 mm x 32mm.
I cut 6 uprights from 63 x 38 CLS timber and drove them into the ground along the path edge as uprights.
Nailed on the handrails - leaving a four foot gap for access.
Jackie helped me to staple on the barrier mesh - a roll of orange safety barrier we bought for £10 years ago - for keeping chickens off freshly sown grass seed and similar jobs.
It is very flimsy - but the wind goes straight through it without putting pressure on the fence.
I cut thin strips of 20mm wide pine and stapled it on to trap the thin mesh along all edges - it worked really well !
I dug out a wire mesh and timber door that I made for the potting shed to make it into an isolation cage for sick chickens - I fashioned two flat metal hooks from thin angle brackets - then hooked it on - great !
The gate is not as high as the handrails - I will extend it for neatness.
Jackie is pleased - Penny is not pleased - she can not get to sniff out the trails from any night creatures we get ( there is a fox sett in the field behind our house ) !!!
Hopefully - no sludge in the house or on furniture now - I hope !!
To help a bit more - I relocated the boot scraper to a position near the gate.
The rest of the day we spent on domestic stuff and walking Penny in Bluebell woods - she loves it.
Mike.
Friday, 18 November 2016
Thursday, 17 November 2016
End Of Phase One !!
Wednesday 16th and Thursday 17th of November 2016
What was forecast as a dry day turned out to be showery !!
I got set up early to finish the last 15 or so barrow loads when Scott turned up and we polished them off in no time !!
The site clear at last
Scott with the last barrow load !!
We checked a few high spots with the dumpy level trimmed off a couple of inches - ALL DONE !!
Ready for the grab truck - or so I thought !!
A phone call to a local grab truck company - Yes we can take away your pile of muck - are you sure that there is no wood or plastic in it - NONE.
That's good.
Are you sure that there is no grass or plant roots in it - ITS FULL OF IT !!
The tip will not take it as landfill - sorry.
OK - I will just have to pick it all out then, before your truck arrives !!!
That's OK then - he will be there first thing tomorrow - £180 per load - cash.
What a bombshell - my fault - I should have called them before we started moving the stuff - WOW.
So I spent the afternoon raking and picking out grass sods and root balls galore until the neat pile was scattered all over the drive.
My plan was to make the pile appear to be free of grass and roots and to convince the grab truck driver it was OK to take it. To clear the whole pile in a few hours was impossible.
I did manage to pull out a size able pile of roots and sods before dark.
Thursday
The truck turned up a bit later than they said - No Problem.
The driver took one look at the pile and said - I can get rid of it for you - It Worked !!!!
The first bite !
He was very skillful with the grab and soon gobbled up the pile in one load.
The website said that the truck was 15 tonnes capacity but what turned up was 18 tonnes capacity.
I was expecting to have two loads but the driver said - I'll get it all on this load - possibly a bit overweight.
Clearing up the bits.
Nearly gone !
All gone in 20 minutes - One load - only two bucket fulls to clean up plus a scrape up with the shovel, a brush with the stiff yard brush before the rain at 11 am !!
I did beat the rain - clearing up the dry muck just in time - then waterproof gear on - long hose right through the house ! - cleaning up all residue.
It took all the rest of the day to get cleaned up - all the roots bagged up and loaded into my poor little car - the retaining boards dismantled - drain gully emptied everything put away like it never happened.
All there is to show on the drive are the scratches on the concrete from the grab - no bother.
End of phase one - the excavation - next - set out the base - calculate the quantity of crushed brick required for the sub base - have that delivered in bulk - then barrow that round - level it out - rent a Wacker compactor plate and when that's done - build the base former.
All for now - Mike.
What was forecast as a dry day turned out to be showery !!
I got set up early to finish the last 15 or so barrow loads when Scott turned up and we polished them off in no time !!
The site clear at last
Scott with the last barrow load !!
We checked a few high spots with the dumpy level trimmed off a couple of inches - ALL DONE !!
Ready for the grab truck - or so I thought !!
A phone call to a local grab truck company - Yes we can take away your pile of muck - are you sure that there is no wood or plastic in it - NONE.
That's good.
Are you sure that there is no grass or plant roots in it - ITS FULL OF IT !!
The tip will not take it as landfill - sorry.
OK - I will just have to pick it all out then, before your truck arrives !!!
That's OK then - he will be there first thing tomorrow - £180 per load - cash.
What a bombshell - my fault - I should have called them before we started moving the stuff - WOW.
So I spent the afternoon raking and picking out grass sods and root balls galore until the neat pile was scattered all over the drive.
My plan was to make the pile appear to be free of grass and roots and to convince the grab truck driver it was OK to take it. To clear the whole pile in a few hours was impossible.
I did manage to pull out a size able pile of roots and sods before dark.
Thursday
The truck turned up a bit later than they said - No Problem.
The driver took one look at the pile and said - I can get rid of it for you - It Worked !!!!
The first bite !
He was very skillful with the grab and soon gobbled up the pile in one load.
The website said that the truck was 15 tonnes capacity but what turned up was 18 tonnes capacity.
I was expecting to have two loads but the driver said - I'll get it all on this load - possibly a bit overweight.
Clearing up the bits.
Nearly gone !
All gone in 20 minutes - One load - only two bucket fulls to clean up plus a scrape up with the shovel, a brush with the stiff yard brush before the rain at 11 am !!
I did beat the rain - clearing up the dry muck just in time - then waterproof gear on - long hose right through the house ! - cleaning up all residue.
It took all the rest of the day to get cleaned up - all the roots bagged up and loaded into my poor little car - the retaining boards dismantled - drain gully emptied everything put away like it never happened.
All there is to show on the drive are the scratches on the concrete from the grab - no bother.
End of phase one - the excavation - next - set out the base - calculate the quantity of crushed brick required for the sub base - have that delivered in bulk - then barrow that round - level it out - rent a Wacker compactor plate and when that's done - build the base former.
All for now - Mike.
Wednesday, 16 November 2016
Nearly There !
Tuesday 15th of November 2016
Another overcast and damp morning - but no rain today - so the ground might dry up during the day ?
I decided to dig a section of the rockery that is a bit bigger than half of what's left - starting at the front - the soil was wet and heavy - slow going.
I roughly estimated 20 barrow loads for today - but it is was it is.
Gradually the soil dried up as it got deeper and all done for today at 15.30.
The whole area now looks like the Somme battle ground - puddles - sludge - bits of slate - it can only get better from here on ??
Jackie helped to hose the paths while I swept with the heavy yard brush - All tidy before dark - great.
The pile of muck is now massive and we can only just get Jackie's car out - Mine would be multiple shunts to get out !!
A fine day tomorrow - I aim to finish the big dig - take levels - dig off any high spots - arrange for the Grab Truck for Thursday if they can ?
NEARLY THERE !!
Mike.
Another overcast and damp morning - but no rain today - so the ground might dry up during the day ?
I decided to dig a section of the rockery that is a bit bigger than half of what's left - starting at the front - the soil was wet and heavy - slow going.
I roughly estimated 20 barrow loads for today - but it is was it is.
Gradually the soil dried up as it got deeper and all done for today at 15.30.
The whole area now looks like the Somme battle ground - puddles - sludge - bits of slate - it can only get better from here on ??
Jackie helped to hose the paths while I swept with the heavy yard brush - All tidy before dark - great.
The pile of muck is now massive and we can only just get Jackie's car out - Mine would be multiple shunts to get out !!
A fine day tomorrow - I aim to finish the big dig - take levels - dig off any high spots - arrange for the Grab Truck for Thursday if they can ?
NEARLY THERE !!
Mike.
Tuesday, 15 November 2016
Recovery Day
Monday 14th of November 2016
A damp start today - little bit of drizzle - not good for digging and barrowing - there would be mud everywhere.
So today - plan B.
Two trips to the tip - my poor little car - full to the roof with huge poly bags of garden waste - shredded bushes - rotten timber and bush roots.
Jackie helped to sort it all out at the tip - we go so often that we know the routine well !
The worst job is the bag of chicken and dog poo - Erghhhh !
We have a dedicated small wheelie bin for it - lined with a really thick poly bag - the bin and bag dosed with Jeyes Fluid. We slide the bag out with the bin tilted forward and the bag drops into a big soft plastic builders bucket / tote. - in summer the pong is bad, so we tie wrap the neck of the bag, but today was not so bad.
The bucket stops any drips and makes it easy to carry the bag with it's two handles. - it all goes for composting with the garden waste at the tip.
Then tidy up everywhere - hose down the paths - sort out the potting shed.
No progress with digging today - the forecast looks like the same tomorrow - it might be dry enough in the afternoon - Wednesday looks better.
Mike.
A damp start today - little bit of drizzle - not good for digging and barrowing - there would be mud everywhere.
So today - plan B.
Two trips to the tip - my poor little car - full to the roof with huge poly bags of garden waste - shredded bushes - rotten timber and bush roots.
Jackie helped to sort it all out at the tip - we go so often that we know the routine well !
The worst job is the bag of chicken and dog poo - Erghhhh !
We have a dedicated small wheelie bin for it - lined with a really thick poly bag - the bin and bag dosed with Jeyes Fluid. We slide the bag out with the bin tilted forward and the bag drops into a big soft plastic builders bucket / tote. - in summer the pong is bad, so we tie wrap the neck of the bag, but today was not so bad.
The bucket stops any drips and makes it easy to carry the bag with it's two handles. - it all goes for composting with the garden waste at the tip.
Then tidy up everywhere - hose down the paths - sort out the potting shed.
No progress with digging today - the forecast looks like the same tomorrow - it might be dry enough in the afternoon - Wednesday looks better.
Mike.
Monday, 14 November 2016
Hi Ho - Hi Ho It's off to work I go.
Sunday 13th of November 2016
A lovely dry and sunny day - so digging - digging today.
Jackie helped to tidy up the garden and chicken run area - so that we are working as tidy as possible.
Then I decided to aim at moving a section of the rockery about 18 inches high by 3 feet wide and 8 feet long - all the way to the fence - I guessed at 20 barrow loads, maybe ?
I hate trailing mud all over the paths so I quickly made a simple boot scraper - two bits of timber knocked into the ground and a thin piece of steel screwed between them - it works well.
I am still using the wonderful Mattock - the big wide blade chops through the soil / roots and stones and gives a pile of easy to shovel waste - Great !! - well worth the fiver on Ebay.
I got stuck in - I thought I would be on my own today but Jackie decided to fill three barrows for me - WOW!
In the end it took about 25 barrow loads to clear the area - I had enough by then - time to clear up.
The pile is really growing now - I can't go any further across the drive - so I am extending the pile towards the house.
That means the grab truck will have to reach further - they have a limit of 5 metres - I must measure up.!
I am using a long plank now to get the barrow high up the pile - Scott and Neil were using it when they were here but I wasn't quite fit enough and my left arm won't flick the barrow over - but today I went for it and I got it !!!
I estimate another two days like today - 40 to 50 barrow loads left - Just keep going.
Mike.
A lovely dry and sunny day - so digging - digging today.
Jackie helped to tidy up the garden and chicken run area - so that we are working as tidy as possible.
Then I decided to aim at moving a section of the rockery about 18 inches high by 3 feet wide and 8 feet long - all the way to the fence - I guessed at 20 barrow loads, maybe ?
I hate trailing mud all over the paths so I quickly made a simple boot scraper - two bits of timber knocked into the ground and a thin piece of steel screwed between them - it works well.
I am still using the wonderful Mattock - the big wide blade chops through the soil / roots and stones and gives a pile of easy to shovel waste - Great !! - well worth the fiver on Ebay.
I got stuck in - I thought I would be on my own today but Jackie decided to fill three barrows for me - WOW!
I have been so lucky with the weather - maybe I started just early enough in the year - the ground is nice and dry - it breaks up easily.
It would be 10 times harder to dig wet through soil.
In the end it took about 25 barrow loads to clear the area - I had enough by then - time to clear up.
The pile is really growing now - I can't go any further across the drive - so I am extending the pile towards the house.
That means the grab truck will have to reach further - they have a limit of 5 metres - I must measure up.!
I am using a long plank now to get the barrow high up the pile - Scott and Neil were using it when they were here but I wasn't quite fit enough and my left arm won't flick the barrow over - but today I went for it and I got it !!!
I estimate another two days like today - 40 to 50 barrow loads left - Just keep going.
Mike.
Saturday, 12 November 2016
More Digging.
Friday 11th of November 2016
Today was a lovely dry and sunny day in Derby - Ideal for more digging.
Neil from next door came to help today and brought his wheel barrow !
We carried on digging what was the rockery - advancing the cut edge towards the right hand fence - then concentrating on a 2 foot wide dig at the back which eventually reached the right hand fence!
Much better digging today in the dry - I won't dig in the rain again - the sludge trails all over and your boots weigh a ton !!
We took levels as we went along so that we didn't dig out any soil we don't have to.
The area looks strange with no visual level reference - the fence slopes down towards the end of the garden - it all appears wrong but the dumpy level says its good.
I have decided to try and get all the soil on the drive if we can before I get the grab truck in and then they can quote for the whole lot.
The pile is really growing now - I am amazed at the rapid progress, thanks to Scott and Neil for all their efforts.
Heavy rain tomorrow - Saturday - so a day off digging - back to it on Sunday.
Just to be be sure that I don't get a river of sludge in the rain - I covered the muck pile with Visqueen overnight.
Mike.
Today was a lovely dry and sunny day in Derby - Ideal for more digging.
Neil from next door came to help today and brought his wheel barrow !
Much better digging today in the dry - I won't dig in the rain again - the sludge trails all over and your boots weigh a ton !!
We took levels as we went along so that we didn't dig out any soil we don't have to.
The area looks strange with no visual level reference - the fence slopes down towards the end of the garden - it all appears wrong but the dumpy level says its good.
I have decided to try and get all the soil on the drive if we can before I get the grab truck in and then they can quote for the whole lot.
The pile is really growing now - I am amazed at the rapid progress, thanks to Scott and Neil for all their efforts.
Heavy rain tomorrow - Saturday - so a day off digging - back to it on Sunday.
Just to be be sure that I don't get a river of sludge in the rain - I covered the muck pile with Visqueen overnight.
Mike.
Friday, 11 November 2016
Workshop at home in Derby
Friday 4th of November 2016
Now that the Summer house renovation is complete and Blazer is in good shape - I have managed to spend about three months there this year - (that was the plan after last year hardly getting to Blazer at all ).
Time for the Big Project - A big workshop - big enough to take all my wood working and metal working machines plus everything that I have in storage in Sheffield.
My wood turning workshop in Sheffield is still in operation with John working from there - sometimes jobs for me and sometimes for himself - plus I have a sub let tenant - Dave who rents half the shop to help pay the rent.
The situation is that John is looking to retire in the new year which means that the workshop will be costing me instead of earning a little.
It has taken me 16 years to find the top quality wood working machines that I have in Sheffield and I love them - they have allowed my little company to produce fine quality turnings for one of Britain's top furniture companies - If I sell them individually I will only get a fraction of their value.
I wish to keep them and use them to make items of furniture perhaps for new family here in Derby - without the overheads of a rented workshop 40 miles away.
Jackie has kindly agreed to me building a big workshop here in our garden and for my part - I will do my best to make it look attractive.
To prepare the area we decided to get rid of two raised beds that adjoin the big raised bed and to relocate the fruit bush into the big raised bed.
Jackie had already moved the bush while I was in France - so it was a case of moving the soil into the big raised bed and riddling the last of it to take out the slate ground cover - done !
We also decided to remove the diseased pear tree which was poorly rooted anyway and at the same time we pruned the plum tree and shredded all the cuttings ready for the tip.
So today we started to clear the area in the far right hand corner of the garden.
When the summer house was built some 10 years ago, or more, the soil from the excavation was made into a big rockery in this corner - I now have to move it again - this time to the tip !
The first job was to move the slate ground cover off the site so that it does not become contaminated with soil and concrete making it useless for filling in around the workshop at the end of the project.
I started the job today - raking it up - down to the weed membrane and then into the barrow and heaping it up just off the site.
Jackie helped to relocate the slab circle with the wishing well and collection of grasses to a spot near the chicken hut.
I then made a substantial timber ramp for the barrow to get up the two steps to the front of the house.
To my surprise Jackie's son Scott volunteered to help with the digging - WONDERFUL !!
Tuesday 8th of November
We removed the stone wall that was around the small pond and the rockery - hard work - every stone was a battle.
We dug out the pond - pulled out the rubber liner and filled it in with stone.
I took some advice from a local company who explained that I would save money and make life easier if I didn't use skips and instead use a grab lorry.
So I made a wooden barrier between us and next door - near the causeway - to pile up the muck within reach of the grab without him coming onto the drive which would damage the slabs.
It worked well - not having to barrow up into a skip.
Thursday 10th of November.
Scott again helping ( more like doing most of the work ) we started digging in earnest - a lot easier that moving the rocks.
We use a mattock to loosen the soil and then easily shovel it to the barrow.
So that we don't dig out any more than we need to - I took levels as we went along.
I bought a dumpy level on EBay for £40 - fantastic for very accurate level measurements - I have used one before and knew how good they are - on this site a spirit level would be useless and could lead to massive errors.
The workshop will be 24 feet ( 7.4 metres ) by 12 feet ( 3.7 metres ) externally with a 2 foot gap to the fence at the back and the side.
There will be around 7 feet space between the workshop and the summer house to allow as much light into the summer house as possible.
Once the site is clear and level, I can lay out the concrete base easily now that I have the tools.
After this project I can resell the dumpy level and might even make a profit !
The only problem we had today was the weather - it rained on and off until early afternoon, which turned the soil to sludge and we trailed it everywhere - Jackie was NOT HAPPY !!
Then the sun came out - we hosed and swept the paths and our boots - ALL SORTED
We are about half way through the rockery clearance now - Scott is back at work - so I will slowly press on on my own shifting the rest of it.
Mike.
Now that the Summer house renovation is complete and Blazer is in good shape - I have managed to spend about three months there this year - (that was the plan after last year hardly getting to Blazer at all ).
Time for the Big Project - A big workshop - big enough to take all my wood working and metal working machines plus everything that I have in storage in Sheffield.
My wood turning workshop in Sheffield is still in operation with John working from there - sometimes jobs for me and sometimes for himself - plus I have a sub let tenant - Dave who rents half the shop to help pay the rent.
The situation is that John is looking to retire in the new year which means that the workshop will be costing me instead of earning a little.
It has taken me 16 years to find the top quality wood working machines that I have in Sheffield and I love them - they have allowed my little company to produce fine quality turnings for one of Britain's top furniture companies - If I sell them individually I will only get a fraction of their value.
I wish to keep them and use them to make items of furniture perhaps for new family here in Derby - without the overheads of a rented workshop 40 miles away.
Jackie has kindly agreed to me building a big workshop here in our garden and for my part - I will do my best to make it look attractive.
To prepare the area we decided to get rid of two raised beds that adjoin the big raised bed and to relocate the fruit bush into the big raised bed.
Jackie had already moved the bush while I was in France - so it was a case of moving the soil into the big raised bed and riddling the last of it to take out the slate ground cover - done !
We also decided to remove the diseased pear tree which was poorly rooted anyway and at the same time we pruned the plum tree and shredded all the cuttings ready for the tip.
So today we started to clear the area in the far right hand corner of the garden.
When the summer house was built some 10 years ago, or more, the soil from the excavation was made into a big rockery in this corner - I now have to move it again - this time to the tip !
The first job was to move the slate ground cover off the site so that it does not become contaminated with soil and concrete making it useless for filling in around the workshop at the end of the project.
I started the job today - raking it up - down to the weed membrane and then into the barrow and heaping it up just off the site.
Jackie helped to relocate the slab circle with the wishing well and collection of grasses to a spot near the chicken hut.
I then made a substantial timber ramp for the barrow to get up the two steps to the front of the house.
To my surprise Jackie's son Scott volunteered to help with the digging - WONDERFUL !!
Tuesday 8th of November
We removed the stone wall that was around the small pond and the rockery - hard work - every stone was a battle.
We dug out the pond - pulled out the rubber liner and filled it in with stone.
I took some advice from a local company who explained that I would save money and make life easier if I didn't use skips and instead use a grab lorry.
So I made a wooden barrier between us and next door - near the causeway - to pile up the muck within reach of the grab without him coming onto the drive which would damage the slabs.
It worked well - not having to barrow up into a skip.
Thursday 10th of November.
Scott again helping ( more like doing most of the work ) we started digging in earnest - a lot easier that moving the rocks.
We use a mattock to loosen the soil and then easily shovel it to the barrow.
So that we don't dig out any more than we need to - I took levels as we went along.
I bought a dumpy level on EBay for £40 - fantastic for very accurate level measurements - I have used one before and knew how good they are - on this site a spirit level would be useless and could lead to massive errors.
The workshop will be 24 feet ( 7.4 metres ) by 12 feet ( 3.7 metres ) externally with a 2 foot gap to the fence at the back and the side.
There will be around 7 feet space between the workshop and the summer house to allow as much light into the summer house as possible.
Once the site is clear and level, I can lay out the concrete base easily now that I have the tools.
After this project I can resell the dumpy level and might even make a profit !
The only problem we had today was the weather - it rained on and off until early afternoon, which turned the soil to sludge and we trailed it everywhere - Jackie was NOT HAPPY !!
Then the sun came out - we hosed and swept the paths and our boots - ALL SORTED
We are about half way through the rockery clearance now - Scott is back at work - so I will slowly press on on my own shifting the rest of it.
Mike.
Subscribe to:
Posts (Atom)















